Operator reports, regulatory submissions, supplier case studies, project records and engineering papers. Record citations include page or section locators. Publication labels are separate from the review date; undated pages and modern PDF upload dates are not commissioning dates.
CKIT / pipeconveyor.com · legacy supplier register · Publication / date label: 2004-09 · Reviewed 2026-10-04
Rows 18-28 were in progress and carried expected commissioning dates. Rows 5-6 and 9-10 each describe two conveyors.
CKIT / Phil Staples · legacy technical article · Reviewed 2026-10-04
Historical lead source; names and dimensions require newer confirmation.
Conveyor Dynamics, Inc. · engineering reference register · Reviewed 2026-10-06
Use only the pipe conveyor table. Other tables include troughed conveyors, chutes, and controls projects.
Conveyor Dynamics, Inc. · supplier case · Reviewed 2026-10-04
Conveyor Dynamics, Inc. · supplier case · Reviewed 2026-10-04
Conveyor Dynamics, Inc. · supplier case · Reviewed 2026-10-04
Conveyor Dynamics, Inc. · supplier case · Reviewed 2026-10-04
Conveyor Dynamics, Inc. · supplier case · Reviewed 2026-10-04
Conveyor Dynamics, Inc. · supplier case · Reviewed 2026-10-04
Conveyor Dynamics, Inc. · supplier case · Reviewed 2026-10-04
Conveyor Dynamics, Inc. · supplier case · Reviewed 2026-10-04
Conveyor Dynamics, Inc. · supplier case · Reviewed 2026-10-04
Conveyor Dynamics, Inc. · supplier case · Reviewed 2026-10-04
Conveyor Dynamics, Inc. · supplier case · Reviewed 2026-10-04
Conveyor Dynamics, Inc. · supplier case · Reviewed 2026-10-04
Conveyor Dynamics, Inc. · supplier case · Reviewed 2026-10-04
Conveyor Dynamics, Inc. · supplier case · Reviewed 2026-10-04
Conveyor Dynamics, Inc. · supplier case · Reviewed 2026-10-04
Conveyor Dynamics, Inc. · supplier case · Reviewed 2026-10-04
Conveyor Dynamics, Inc. · supplier case · Reviewed 2026-10-04
Conveyor Dynamics, Inc. · supplier case · Reviewed 2026-10-04
Conveyor Dynamics, Inc. · supplier case · Reviewed 2026-10-04
Conveyor Dynamics, Inc. · supplier case · Reviewed 2026-10-04
Conveyor Dynamics, Inc. · supplier case · Reviewed 2026-10-04
Conveyor Dynamics, Inc. · supplier case · Reviewed 2026-10-04
Conveyor Dynamics, Inc. · supplier case · Reviewed 2026-10-04
BEUMER Group · supplier brochure · Publication / date label: 2016-04 · Reviewed 2026-10-04
Printed code EN0416. PDF page 7 visually checked: pipe references start in the middle column and continue in the right column.
BEUMER Group · supplier case · Reviewed 2026-10-04
BEUMER Group · supplier case · Reviewed 2026-10-04
BEUMER Group · supplier technical paper · Reviewed 2026-10-04
BEUMER Group · supplier case · Reviewed 2026-10-04
BEUMER Group · supplier press release · Publication / date label: 2021-04-28 · Reviewed 2026-10-04
BEUMER Group · supplier brochure · Reviewed 2026-10-04
BEUMER Group · supplier press release · Reviewed 2026-10-04
BEUMER Group · supplier brochure · Publication / date label: 2023 · Reviewed 2026-10-04
BEUMER Group / FAM · supplier reference register · Reviewed 2026-10-04
BEUMER Group · supplier order announcement · Publication / date label: 2024-04-18 · Reviewed 2026-10-04
Port de Saguenay · operator project update · Reviewed 2026-10-04
Homepage inspected on the review date; still describes implementation as in progress.
Macmet Engineering · supplier reference register · Reviewed 2026-10-04
Macmet Engineering · supplier reference register · Reviewed 2026-10-04
Macmet Engineering · supplier news · Publication / date label: 2019 · Reviewed 2026-10-04
Supplier-controlled blog linked from the official website; it is not independent corroboration.
Macmet Engineering · supplier news · Publication / date label: 2013-11-19 · Reviewed 2026-10-04
Macmet Engineering · supplier news · Publication / date label: 2020-09-15 · Reviewed 2026-10-04
Macmet Engineering · supplier news · Reviewed 2026-10-04
Includes 2026-03-19 Kulda / Garjanbahal order and 2022-09-16 Jindal capacity upgrade order. Other conveyor projects are not automatically pipe conveyors.
ContiTech / Continental · supplier brochure republished by trade fair · Publication / date label: 2017-09 · Reviewed 2026-10-04
Original supplier document on Hannover Messe exhibitor infrastructure. Printed pages 10-15 are application examples; pipe diameter may be outer or oval nominal.
Bowie Resource Partners (SEC filing) · operator regulatory filing · Publication / date label: 2015 · Reviewed 2026-10-04
DemcoTECH (supplier-hosted Dry Cargo International article) · supplier hosted technical article · Publication / date label: 2024-09 · Reviewed 2026-10-04
Pipe-conveyor section distinguishes these systems from AeroConveyors. AeroConveyor references at Moma are excluded.
Harmony Gold · operator operating description · Reviewed 2026-10-04
Harmony Gold · operator regulatory filing · Publication / date label: 2014 · Reviewed 2026-10-04
Macmet Engineering · supplier order announcement · Publication / date label: 2026-03-19 · Reviewed 2026-10-04
Macmet Engineering · supplier order announcement · Publication / date label: 2022-09-16 · Reviewed 2026-10-04
Macmet Engineering · supplier commissioning announcement · Publication / date label: 2019-10-22 · Reviewed 2026-10-04
Macmet Engineering · supplier order announcement · Publication / date label: 2026-02-05 · Reviewed 2026-10-04
Macmet Engineering · supplier order announcement · Publication / date label: 2026-01-12 · Reviewed 2026-10-04
Cementos Lima / UNACEM · operator sustainability report · Publication / date label: 2008 · Reviewed 2026-10-04
UNACEM · operator sustainability report · Publication / date label: 2016 · Reviewed 2026-10-04
ITD Cementation (now Cemindia Projects) · contractor annual report · Publication / date label: 2021 · Reviewed 2026-10-04
The former itdcem.co.in PDF URL now redirects; this successor-domain PDF was retrieved and checked.
ITD Cementation (now Cemindia Projects) · contractor management transcript · Publication / date label: 2024-08-08 · Reviewed 2026-10-04
Publication date is the dated call, not the 2016 upload-directory label.
ITD Cementation (now Cemindia Projects) · contractor management transcript · Publication / date label: 2024-08-28 · Reviewed 2026-10-04
The New Indian Express · original news reporting with operator quotes · Publication / date label: 2026-02-25 · Reviewed 2026-10-04
Original reporting quotes TNPGCL officials; this is corroboration through reporting, not an operator-issued document or a full-load acceptance certificate.
Holtec Consulting · engineering company brochure · Publication / date label: 2018-05 (PDF title) · Reviewed 2026-10-04
PDF pages 21, 26 and 27 inspected visually. Consultancy or study completion is not automatically conveyor commissioning.
Dalmia Cement (Bharat), filed with MoEFCC · operator regulatory submission · Publication / date label: 2019-07 · Reviewed 2026-10-04
Section 2.3 describes the existing cement process; the overall expansion proposal is distinct from the installed equipment described there.
Coromandel Fertilisers, BSE filing · operator annual report · Publication / date label: 2002 · Reviewed 2026-10-04
Printed pages 10 and 26 / PDF pages 12 and 28 inspected visually; explicitly names CKIT technology for rock-dust transfer.
Tata Steel · operator press release · Publication / date label: 2020-12-30 · Reviewed 2026-10-04
TANGEDCO / TNPGCL website · operator project status · Reviewed 2026-10-04
Undated one-page sheet includes plant events through February 2015; describes the pipe conveyor as newly commissioned, without its own event date.
NTPC / NTECL · operator maintenance tender · Publication / date label: 2024-06-29 · Reviewed 2026-10-04
Tender GEM/2024/B/5053522 supports an installed asset and planned maintenance coverage; it does not prove uninterrupted operation throughout the tender period.
American Galvanizers Association, project-team case study · project team case study · Publication / date label: 2010 · Reviewed 2026-10-04
Names Young Galvanizing, First Energy, Koch GM and Classic Conveyor. The 2010 award label and case-sheet layout were inspected visually; this is not a commissioning date.
C. Buchanan, Bateman Materials Handling; Beltcon 3 / IMHC · supplier conference paper · Publication / date label: 1985 · Reviewed 2026-10-04
Original conference scan: printed page 3 / PDF page 5 inspected visually. The 2025 upload and 2014 scanning dates are not publication dates.
I. W. Day, British Coal Corporation; Beltcon 7 / IMHC · operator engineer conference paper · Publication / date label: 1993 · Reviewed 2026-10-06
Original scan checked against a readable archive transcription. The author states that the views are his and not necessarily British Coal’s; installed assets and operating observations are described directly.
H. Ergin, C. Kuzu and M. Cetinkaya; Istanbul Technical University research repository / World Cement · original project research abstract · Publication / date label: 2004 · Reviewed 2026-10-04
Institutional abstract of World Cement 35 supplement, pages 23–26. Full article was not available; dimensions and commissioning date remain unset.
DOKA Industry · contractor completed project reference · Reviewed 2026-10-04
Completed-project list includes the limestone crusher and pipe conveyor system under the Batı Söke third clinker-line investment.
Vattenfall · operator site closure and sale · Publication / date label: 2023-03-02 · Reviewed 2026-10-04
Confirms plant closure in July 2021 and sale effective March 1, 2023. Does not inventory the remaining pipe-conveyor components.
ACC, filed with MoEFCC · operator regulatory submission · Publication / date label: 2021-10 · Reviewed 2026-10-04
Provides a Chaibasa pipe-conveyor transport description, but no 2.4 km length or supplier identification. Future-tense wording does not establish commissioning of the disputed Macmet asset.
VERBUND · operator annual report · Publication / date label: 2010 report · Reviewed 2026-10-04
Printed p. 79 establishes the year it went into operation; direct retrieval was blocked, but the indexed original report text was reviewed.
Binder Industrieanlagenbau · fabrication and assembly reference · Reviewed 2026-10-04
FLSmidth is named as the client. The Dürnrohr 1,000-ton figure is structural weight, not conveying capacity. The Wotan 250 m entry is not matched to BEUMER’s additional 213 m asset.
Dr. Matthias Schweizer, BEUMER Group / bulk solids handling · supplier authored case study · Publication / date label: 2014; web republication 2020-04-17 · Reviewed 2026-10-04
Originally bulk solids handling 34 (2014), no. 6. Supplier author quotes Schwenk production manager Dirk Fabian; this is not an independently issued operator report.
Josef Staribacher, BEUMER Group Austria / Conveyor Technology Guide · supplier authored case study · Publication / date label: 2015/2016 edition · Reviewed 2026-10-04
Printed pp. 34–36. The additional conveyor is 213 m in the detailed description; the introduction rounds it to 200 m.
Wismut GmbH · operator press release · Publication / date label: 2023-12-15 · Reviewed 2026-10-04
Reports transport during 1997–2016 on a 1.8 km pipe conveyor. The cumulative 3.25 million m³ is not an hourly rating.
Wismut GmbH · operator environment report · Publication / date label: 2017 reporting year · Reviewed 2026-10-04
Printed/PDF pp. 7 and 41: approximately 2 km; dismantling completed in September 2017. Publication day is not established.
Schoombie Hartmann · engineering contractor completion reference · Reviewed 2026-10-04
Phase 3.5 has an explicit July 2013 completion date. Direct access was challenged; the indexed primary project page was reviewed. Annual capacity refers to the entire terminal.
TRANSPORTA · supplier retrofit reference · Reviewed 2026-10-04
Reference 22028Z describes a U-conveyor upgrade of the original pipe conveyor at Prunéřov. Generic product capacities are not assigned to this installation.
Mott MacDonald for ESB / An Bord Pleanála · operator commissioned environmental report · Publication / date label: 2024-02 · Reviewed 2026-10-04
Section 3.5.4, printed p. 36 / PDF p. 68, describes the existing batching building and pipe conveyor. Future ash-recovery proposals are separate.
M&F Anlagenbau · engineering project reference · Reviewed 2026-10-04
The Moneypoint entry names redundant pipe conveyors for conditioned electrostatic-precipitator ash. Exact route correspondence with the 2024 ESB process description remains unresolved.
Portasilo / Process Industry Informer · supplier case study with operator quote · Publication / date label: 2008-08-07 · Reviewed 2026-10-04
Supplier case quoting Ferrybridge project manager Andrew Mills. Names two installed pipe conveyors but does not explicitly establish self-closing flat-belt construction. Retained as a technology-identification lead, not an installation row.
BEUMER Group / bulk-online · supplier case study with operator quote · Publication / date label: 2018-01-22 · Reviewed 2026-10-04
Names plant managers and supplier personnel; two installed conveyors and October 2016 system commissioning. January 2017 running date is distinct. The figure caption explicitly uses tonnes per hour.
Marcel Kumžák / LinkedIn · project manager self report · Reviewed 2026-10-04
Public professional project descriptions reviewed from indexed profile text. Project periods and commissioning responsibilities do not establish dated plant acceptance. Plant-level records remain B without corroboration.
BEUMER Group TV / YouTube · supplier video · Publication / date label: 2017-06-09 · Reviewed 2026-10-04
Published description names Ledvice, Prunéřov, Schwenk Cement, Linz AG, Callao and Ghent. Captions were unavailable; no site-specific timestamps or engineering values were extracted from the footage.
macmetindia / YouTube · supplier video · Publication / date label: 2019-01-11 · Reviewed 2026-10-04
Embedded by Macmet’s official conveyor page. Description names two supplied conveyors, but does not distinguish the Gayatri and TPCIL route specifications or provide acceptance dates.
macmetindia / YouTube · supplier video · Publication / date label: 2022-07-19 · Reviewed 2026-10-04
Embedded by Macmet’s official conveyor page. Description explicitly names Nandihalli yard to Jindal Toranagallu and supplier supervision of erection and commissioning. Video date is not the commissioning date.
BEUMER Group TV / YouTube · supplier video · Publication / date label: 2019-10-22 · Reviewed 2026-10-04
Description identifies Langshan port, Shandong Steel and Rizhao Steel and an installed 6.6 km system. Linked to the expansion record, not the original three-conveyor system. Publication date is not installation date.
Andrey Minkin, Andreas Jungk and Thomas Hontscha / ContiTech / PROCESS Worldwide · supplier authored maintenance case study · Publication / date label: 2012 original; web republication 2018-05-23 · Reviewed 2026-10-04
Original bulk solids handling 32 (2012), no. 6, pp. 16–21. Documents belt replacement and commissioning on existing BC-8, not a new conveyor installation.
Sergio Zamorano / FAM América Latina / Beltcon 21 · author conference paper · Publication / date label: 2023 · Reviewed 2026-10-04
Paper 21-06; archive upload year differs from conference year. Colombian and Argentine examples lack enough site identity for new installation records.
Y. Zhang and R. Steven / SME; hosted by Conveyor Dynamics · author conference paper · Publication / date label: 2012-02 · Reviewed 2026-10-04
SME preprint 12-129. Unnamed field examples are research leads, not independently identified installation records.
M. Pohl and M. Dilefeld / TAKRAF / Beltcon 20 · supplier authored conference paper · Publication / date label: 2019 · Reviewed 2026-10-04
Paper 20-08. Russian power plant is unnamed; similarity to Reftinskaya dimensions alone does not prove identity.
Franz Kessler / University of Leoben / Beltcon 12 · author conference paper · Publication / date label: 2003 · Reviewed 2026-10-04
Reviewed PDF is Kessler’s pipe-guidance paper. The archive lists it as a combined session with Hermann Fruehstueck’s separate Ropecon presentation; that does not make him a coauthor of this PDF. Prototype planning is not counted as a named commercial installation.
A. E. Maton / bulk solids handling · author technical paper · Publication / date label: 2000 · Reviewed 2026-10-04
Volume 20, no. 1, pp. 39–41. Design example and Australian author address do not establish an Australian installation.
Maria E. Zamiralova / TU Delft · doctoral thesis repository · Publication / date label: 2017 · Reviewed 2026-10-04
Institutional metadata and abstract reviewed; Gabriel Lodewijks is listed as promotor. DOI 10.4233/uuid:a989069c-54e4-4d80-a30a-a6fb9b333287. Full thesis has not been assessed in this pass.
Lagoven CRAY project: Amuay overland and wharf pipe-conveyor records
Robins Engineers & Constructors / Tecnofluor / Lagoven project archive · project engineering and field records · Publication / date label: 1994 field-test records; design-sheet date unverified · Library / project archive · Reviewed 2026-10-04
Project archive. Design criteria sheet STD-DS2, sheet 2 of 2, identifies both conveyors and their dimensions. Field-test records establish installed equipment. The original documents are not hosted on this website.
Lagoven Amuay conveyor location drawing
Maven Software / user-confirmed geographic drawing · supplied geographic drawing · Publication / date label: 2026-10-04 · Library / project archive · Reviewed 2026-10-04
Approximate alignments from the marked geographic drawing. CV-9502 runs from the refinery to the coke yard; CV-9506 runs from the wharf transfer toward the shiploader. Equipment endpoints remain approximate.
Fluor · contractor historical project · Reviewed 2026-10-04
Establishes the Lagoven refinery project location at Amuay, Venezuela. Its 1982 refinery-upgrade year is not assigned to either pipe conveyor.
ST Paper Pipe Belt Site Visit, February 2, 2022
Andrew Hustrulid, Shaw Almex Industries · project engineering and field records · Publication / date label: 2022-02-02; site walk 2022-02-01 · Library / project archive · Reviewed 2026-10-05
User project archive: 06 Projects, Site Visits and Quotes/ST Paper Pipe Belt/ST Paper Pipe Belt Site Visit.pdf (DOCX also retained). Page 1 establishes Franklin, Virginia and an operating-system inspection; page 3 gives belt descriptions and three 50 hp tail motors. Approximate original installation year and apparent 2007/2021 replacement dates are retrospective, not commissioning certificates.
ST Paper archived KMZ path and site-visit GPS files
Andrew Hustrulid / user project archive · project engineering and field records · Publication / date label: KMZ attached 2022-01-31; GPS track 2022-02-01 · Library / project archive · Reviewed 2026-10-05
06 Projects, Site Visits and Quotes/ST Paper - ST Tissue pipe belt (Motion, Borup) 2022/ST Paper.kmz: eight-vertex Untitled Path, approximately 1697 m horizontal. All KMZ altitudes are zero placeholders. The separate PipeBelt.kml/CSV contains an extended GPS trip ending near Norfolk and is not a belt alignment or surveyed elevation profile.
TAPPI Tissue360°, reproduced by ST Paper / ST Tissue · operator hosted trade journal feature · Publication / date label: Fall/Winter 2013 · Reviewed 2026-10-05
Printed page 12 describes recycled pulp traveling from the fiber-recycling plant to the paper-machine room via tube/belt conveyors. Plant startup and 250 tpd fiber-plant production are not individual pipe-conveyor commissioning or hourly capacity.
TRANSPIPE Conveyor Belts: Application Engineering, February 2024
Sempertrans · archived manufacturer presentation · Publication / date label: 2024-02 · Library / project archive · Reviewed 2026-10-06
Manufacturer presentation retained in the Pipe Belt Library. Named application slides distinguish conveyor centre distance from delivered belt length. Original presentation is not hosted on this website.
Pipebelt Design: Confine pipe-belt installation examples, R. Steven
Goodyear / Veyance Technologies · archived manufacturer presentation · Publication / date label: 2014 · Library / project archive · Reviewed 2026-10-06
Manufacturer engineering presentation retained in the Pipe Belt Library. Printed slides 32 and 36 name Zhenghai, Kailin and Rizhao; slide 34 names a short Neptune/Vancouver urea-potash application. Anonymous country-only examples are not assigned to installations; imperial fabric designations are not assumed to be N/mm.
Continental · supplier press release · Publication / date label: 2019-05-29 · Reviewed 2026-10-06
Dated press release; web page uploaded March 8, 2021. Reports the Yangquan / YanKan 8.1 km conveyor in use and explicitly labels its 458 mm outer diameter.
Hidden Valley pipe-conveyor belt specification and changeout calculations, 2018
Sempertrans / Conveyor Dynamics, Inc. / project archive · project engineering and field records · Publication / date label: 2018-05-18; 2018-08-01; 2018-09-14 · Library / project archive · Reviewed 2026-10-06
The manufacturer technical data sheet offers ST2250; named P723 Harmony Hidden Valley pipe-conveyor changeout calculations use a 2250 N/mm belt rating. These are historical engineering records, not proof of current belt supply or operation. Original documents are not hosted on this website.
Yijun Zhang, Conveyor Dynamics, Inc. / bulk solids handling · designer authored technical paper · Publication / date label: 2013; bulk solids handling No. 4, pp. 16–21 · Reviewed 2026-10-06
Designer-authored paper hosted by CDI. Printed p. 18, Table 1, names five references and distinguishes project pipe dimensions from generic test/FEM examples. Printed p. 20 separately describes Itaqui PC1 and PC2. These historical reports do not establish the current belt or plant status.
Yijun Zhang, Conveyor Dynamics, Inc. / POWER · designer authored technical article · Publication / date label: 2018-09-01 · Reviewed 2026-10-06
Designer-authored article linked from CDI’s publications page. Custom-Engineered Belt Solutions and Figure 4 explicitly describe a 427 mm formed pipe. Nominal versus outer basis is not specified; it must not be silently normalized to a 400 mm designation.
Henan North China Industrial Plastic Co., Ltd. / FJS Roller · supplier case indexed excerpt · Reviewed 2026-10-06
The search-indexed supplier excerpt lists 400 mm belt pipe diameter with matching 1500 mm width, ST2500, 1000 t/h and 4.5 m/s. Direct page retrieval failed on the review date. This partial-access claim is retained as an unresolved alternative, not selected as the plotted measurement or assigned a nominal/outer basis.
Franklin 1300 project: pipe-conveyor plan and technical specification in STTISSUE_A
Krupp Robins / Union Camp Corporation Franklin project archive · project engineering and field records · Publication / date label: Plan revisions 1993–1994; technical specification undated; packet includes 2007 meeting notes · Library / project archive · Reviewed 2026-10-06
Archive packet retained in the Pipe Belt Library. PDF p. 1 identifies the Union Camp Franklin 1300 project and equipment 430-001-00; p. 6, sections 2.0–2.1, explicitly reports 400 mm pipe diameter and approximately 5700 ft centre-to-centre. The report is a historical specification, not a current survey. Originals and correspondence contact details are not hosted on the website.
AC-Tek · engineering project reference · Reviewed 2026-10-06
The live engineer portfolio describes field measurements at Porto do Itaqui and separate 4.3 km / 600 m conveyors. Its Aditya Birla Dahej twin 4.4 km coal system has a different scope from the 1999 Indo Gulf/Birla Copper record and is not merged by shared customer/location alone.