Pipe conveyors · Engineering history

History of pipe belt conveyors

Early patents, the development of the commercial pipe belt, and the first installations.

Updated .

A pipe belt conveyor encloses its load inside the moving belt. The belt opens at the loading and discharge ends and closes into a tube along the conveying route. Its history spans early enclosed-belt inventions in the 1930s and the later development of the overlapping belt used by the commercial Japan Pipe Conveyor system. Johns, US2013242A; Hashimoto, GB2061853A.

Early tubular belt patents

Henry Stinson Johns developed several early forms of enclosed conveying. His US2013242A, Conveying mechanism, was filed on May 12, 1934 and granted on September 3, 1935. It described two flexible, trough-shaped belts travelling face to face to form a moving tube. US2108488A, Tubular belt conveyer, granted on February 15, 1938, addressed opening the tube to discharge material and described both paired belts and a single tubular belt with a longitudinal slit. These records establish that tubular-belt concepts were already patented before 1940. US2013242A; US2108488A.

Johns' US2212024A, filed on September 12, 1939 and granted on August 20, 1940, concentrated on a grooved pulley that opened a single slitted tubular belt for loading or discharge. It explicitly referred to his earlier patents. The 1940 patent therefore belongs to an existing sequence of inventions. Its preformed, ribbed tube differed from the later JPC belt with overlapping edges. US2212024A.

Development of the commercial pipe belt

Hashimoto's Japanese development began in 1959, with a basic design and patent applications reported by 1964. Full-scale trials in 1970 failed. Bridgestone joined the belt-development work in 1975; successful straight, level trials followed in 1976, then curved and steeply inclined trials in 1977. The central problems were maintaining the pipe shape, controlling twisting and arranging the supporting rollers. Buchanan, Beltcon 3, 1985, printed pp. 2–3.

Kunio Hashimoto's US3338383A, Pipe conveyor, was filed on September 21, 1965 and granted on August 29, 1967. It used a slide fastener to close the belt and a chain attached along the belt to transmit the driving force. This was an early stage of his development: its closure and drive arrangements differed substantially from the subsequent commercial overlapping-belt system. US3338383A.

The later principle appears in JPS5574905A, filed on November 28, 1978 and published on June 5, 1980. Its belt's elastic tendency brought the edges together into an overlapping tube. Hashimoto's British application GB2061853A, filed on October 30, 1979 and published on May 20, 1981, described a belt with its own tendency to roll closed, overlapping edges and surrounding support rollers. It also explained the difficulties caused by material fouling zipper closures. These records document the development of the recognisable overlapping pipe belt. JPS5574905A; GB2061853A.

Improvement continued after commercial introduction. Hashimoto's US4402395A, granted in 1983, addressed twisting by changing the angle of correction rollers. Bridgestone's US4572359A, granted in 1986, addressed belt construction, introducing layers with low friction at the overlap. Together, these patents show how pipe conveying depended on both the supporting machinery and the behaviour of the belt itself. US4402395A; US4572359A.

Original patent drawings

Three original drawing excerpts show the progression from Johns' paired belts to Hashimoto's pipe conveyor and the later overlapping belt. Select a drawing to enlarge it.

Johns' original 1935 drawing sheet shows two trough-shaped belts closing face to face to form a conveying tube.
Johns · 1935US2013242A, drawing sheet 1. The paired belts and their opening arrangement appear in Figures 1–4. Original patent.
Hashimoto's original 1967 patent sheet shows inclined and curved pipe conveyor routes, supporting rollers and belt cross sections.
Hashimoto · 1967US3338383A, drawing sheet 1. This early design used a slide fastener and an attached driving chain. Original patent.
Original Figure 5 shows the loaded and return overlapping pipe belts, each surrounded by six supporting rollers.
Overlapping belt · 1981GB2061853A, Figure 5, published May 20, 1981. The section shows loaded and return belts held by surrounding rollers. Original patent application.

First commercial installations and overseas adoption

The first commercial JPC installation was at Kitakyushu Sand Co-op, Japan, in 1979. It comprised two 300 mm diameter conveyors, 20 m and 28 m long. Buchanan reported them still operating successfully in 1985. Japan Pipe Conveyor Company was formed in 1982. Buchanan, printed p. 3.

Bateman in South Africa became an early overseas licensee; CKIT's historical account identifies it as the first license partner to market the system successfully outside Japan. Other licensees included Koch in Germany, Noyes in France, Dosco in the United Kingdom and Krupp Robins in the United States. CKIT, The History of Pipe Conveyors. By September 1985, Buchanan reported 11 commissioned conveyors in South Africa, seven installations in Taiwan, two in Australia and two in Europe. Buchanan, printed p. 2.

British Coal's early projects illustrate adoption beyond Japan. At Wearmouth Colliery, an 85 m trial conveyor followed a May 1988 installation decision. The trial had a 300 mm pipe diameter and a 300 t/h capacity; its success led to an extension to 300 m, commissioned in May 1989. Experience at Wearmouth supported approval of the 1,658 m Westoe–Harton conveyor, which carried colliery discard to Harton Staithes at a rated 300 t/h. It began carrying the colliery's discard on August 7, 1989, while commissioning and tracking work continued. These are documented early British applications, with distinct dates for the trial decision, extension commissioning and Westoe's start of material transport. Day, Beltcon 7, 1993, printed pp. 4–5 and 10.

Early pipe conveyor photographs

An early Japanese pipe conveyor photograph

Two early sand-handling pipe conveyors crossing between steel supports in Photo 2 of Yoshimoto's 1983 Japanese paper; location unconfirmed.
Early Japanese pipe conveyors · published 1983Sand-handling pipe conveyors, captioned “300 mm-diameter sand transport” in the original paper. Identification as the 1979 Kitakyushu installation is unconfirmed. The photograph's exposure date is not stated.
Source: T. Yoshimoto (吉本 孝夫), パイプコンベヤベルト (Pipe Conveyor Belt), 日本鉱業会誌 99(1147), 1983, p. 834, Photo 2. © The Mining and Materials Processing Institute of Japan. Original paper via J-STAGE.

The early British installation

These views show the Westoe–Harton installation and its setting in South Shields. The 1979 first commercial JPC system at Kitakyushu is documented in the written account above.

The new enclosed Westoe conveyor in the foreground at St Hilda sidings, with redundant coal wagons behind it in September 1989.
The new conveyor · September 1989The conveyor is visible in front of the redundant wagons at St Hilda sidings. Photograph © Chris 802, on Flickr; dated September 1989 in the photographer's description. Image embedded from Flickr.
Annotated aerial photograph from Day's paper showing the rail corridor from Westoe Colliery to Harton Staithes, including a tunnel and three curves.
The Westoe–Harton corridorOriginal annotated aerial photograph, Figure 1 in I. W. Day's 1993 Beltcon paper. It identifies the former rail route, tunnel and curves; the photograph's exposure date is not stated. Original paper, PDF page 14.

Patent and paper figures are cropped from the original scans; the aerial is rotated for reading. Image dates refer to publication or the photographer's description; exposure dates are not known for all images. Image sources and figure references.

Japanese designs and commercial scale-up

Contemporary Japanese sources document both the overlapping pipe belt and machines that closed a belt by holding its edges together. The dates below distinguish trials, product introduction, terminal operation and publication.

Akabira · trials in 1981–83

葛西禎一 and colleagues at the Coal Mining Research Centre and Sumitomo Akabira mine reported cylindrical-belt trials in fiscal years 1981–83. The first surface trial required more power than the JIS-based estimate and could not run loaded. Later trials achieved a 15 m minimum curve radius and satisfactory underground running. Figure 2 shows meeting belt edges held between rollers and a dedicated intermediate discharge device. This is a separate mining trial record; the paper does not establish a connection to the Kitakyushu installation. Kasai et al., 1984, pp. 699–702.

Original Akabira trial drawings show straight and curved frames holding meeting belt edges between rollers, and an intermediate discharge device.
Akabira trial design · published 1984Figure 2: straight-section frame, curved-section frame and intermediate discharge device, from left to right. These are technical drawings.
Source: 葛西禎一 et al., 1984, printed p. 700, Figure 2. © The Mining and Materials Processing Institute of Japan. Original paper, PDF page 2.

Sumitomo · product introduction in July 1985

A November 1985 machinery notice records Sumitomo Heavy Industries' cylindrical-belt conveyor as a July 1985 new product. It describes a flat belt whose edges are held together in a standing, pinched seam (合掌状). This closure differs from the overlapping edges of the JPC pipe belt. The notice documents a product introduction, rather than a first-installation date; it does not establish that this product was the Akabira trial machine. New machinery news, 1985, pp. 59–60.

Historical photograph of a Sumitomo cylindrical-belt conveyor in a 1985 product announcement; the site is unnamed.
Sumitomo cylindrical-belt conveyor · published 1985Photo 3 accompanies the product announcement. The site and exposure date are not stated.
Source: 日本建設機械化協会 調査部会, 新機種ニュース, 建設の機械化 No. 429, November 1985, printed p. 59, Photo 3, item 85-04-07. Original issue, PDF page 69.

Idemitsu Chiba · terminal operation from 1986

A 1988 paper by 永留純裕 of Bridgestone Transport Engineering reports that Idemitsu's Chiba terminal at Sodegaura began commercial operation in October 1986. Table 1 lists two 500 mm conveyors rated at 1,500 t/h and two 700 mm conveyors rated at 3,000 t/h. Its diagrams show overlapping pipe belts. To lower the frame height, one roller was shared between the carrying and return pipes, reducing the paired arrangement from 12 rollers to 11. 永留, 1988, pp. 717–719.

A pipe conveyor following a curve, photographed from a walkway in the 1988 Bridgestone paper.
A curving conveyor · published 1988The original caption says “curving conveyor.” It does not name an individual site or give an exposure date.
Source: 永留純裕, 1988, printed p. 718, Photo 1. © The Mining and Materials Processing Institute of Japan. Original paper, PDF page 2.
Enclosed carrying and return pipe belts supported by repeated roller frames in the 1988 Bridgestone paper.
An enclosed conveyor · published 1988The original caption says “enclosed conveyor.” The caption does not identify a particular terminal conveyor or its diameter.
Source: 永留純裕, 1988, printed p. 718, Photo 2. © The Mining and Materials Processing Institute of Japan. Original paper, PDF page 2.
Original diagrams compare two overlapping pipe belts with separate sets of six rollers, and an 11-roller pair sharing the roller between the pipes.
Overlapping belts and a shared rollerFigures 5–6 compare the 12-roller pair with the compact 11-roller arrangement. The belt edges overlap around the pipe circumference, unlike the standing seam described in the Sumitomo notice.
Source: 永留純裕, 1988, printed p. 719, Figures 5–6. © The Mining and Materials Processing Institute of Japan. Original paper, PDF page 3.

Japanese source references

  1. 葛西禎一・菊田正紀・中山幸弘・石内和之, 曲線用ベルトコンベヤの開発 (Development of a Curved Belt Conveyor), 日本鉱業会誌 100(1159), September 1984, pp. 699–702. DOI and publisher record.
  2. 日本建設機械化協会 調査部会, 新機種ニュース (New machinery news), 建設の機械化 No. 429, November 1985, pp. 59–60, item 85-04-07. Original issue, PDF pages 69–70.
  3. 永留純裕, コールセンター(出光バルクターミナル(株))へのパイプコンベヤの適応性 (Application of Pipe Conveyors to the Coal Centre), 日本鉱業会誌 104(1208), October 1988, pp. 717–719. DOI and publisher record.

Images are cropped from the original scans without reconstruction or enhancement. Photograph publication dates do not establish exposure dates. Image sources, original PDF hashes and crop references.

Selected patent chronology

The dates below distinguish applications from publication and grant. The records cover precursors and later improvements; they do not all describe the same conveyor construction.

Application, publication and grant dates for eight selected patent records
Patent recordApplication or priorityPublication or grantMain contribution
US2013242A — JohnsUS filing: May 12, 1934Granted: September 3, 1935Two flexible belts forming a moving conveying tube.
US2108488A — JohnsUS filing: November 24, 1936Granted: February 15, 1938Opening a tubular belt for discharge.
US2212024A — JohnsUS filing: September 12, 1939Granted: August 20, 1940Grooved opening pulley for a single slitted tubular belt.
US3338383A — HashimotoUS filing: September 21, 1965Granted: August 29, 1967Pipe conveyor with a slide fastener and chain drive.
JPS5574905A — HashimotoJapanese filing: November 28, 1978Published application: June 5, 1980Elastic belt closing into an overlapping tube.
GB2061853A / B — HashimotoUK filing: October 30, 1979Application published: May 20, 1981; grant published: August 24, 1983Belt rolling closed under its own elastic tendency, with overlapping edges and surrounding rollers.
US4402395A — HashimotoEarliest claimed Japanese priority: February 18, 1981; US filing: June 2, 1981Granted: September 6, 1983Adjustable correction rollers to control twisting.
US4572359A — Fujita and Kameta, BridgestoneJapanese priority: April 11, 1983; US filing: March 29, 1984Granted: February 25, 1986Layers with low friction at the belt overlap.